The project will include the following improvements:
Water System:
Installation of new valves, hydrants and fittings
Removal and Replacement of 1,650 plus/minus linear feet of 12 inch cement lined ductile iron water main pipe
Removal and Replacement of 950 plus/minus linear feet of varying diameter service and connection pipes
Removal of existing and replacement with 2,650 plus/minus linear feet of 8 inch to 12 inch ceramic epoxy lined ductile iron pipe
Temporary water service provisions
Sanitary Sewer System:
700 plus/minus feet of 4 inch sewer laterals
New sewer manholes, castings and covers
Temporary sanitary sewer service provisions
Storm-Sewer System:
Replacement and/or repair of existing catch basins, frames and grates
Replacement of existing 18 inch drainage trunk with 650 plus/minus feet of new twin 24 inch reinforced concrete pipe and 915 plus/minus feet of new twin 24 inch DIP
Roadway and Streetscape:
ADA compliant warning surfaces
Areas of decorative bluestone
Areas of full depth asphalt pavement replacement
Decorative brick crosswalks
An informational kiosk, planter boxes, new trees with identification plaques, tree grates and a decorative clock.
Installation of a traffic signal at the King Street and North/South Greeley Avenue intersection
Milling and resurfacing of existing asphalt overlay