Print

Application/Applicant Information and Correspondence

Reports and Correspondence regarding the proposed Chappaqua Station Apartments.

Comments from the public are welcome. You can send your comments to:  This email address is being protected from spambots. You need JavaScript enabled to view it.  
Please note that individual public comments are available for review only at the Town Clerk's office.
 

AUGUST 2013

Architectural

A-1_R11_2013-08-27_SITE_PLAN.pdf

A-2_R08_2013-08-27_1ST_and_2ND_FLOOR_PLAN.pdf

A-3_R08_2013-08-27_3RD_and_4TH_FLOOR_PLAN.pdf

A-4_R12_2013-08-27_SOUTH_and_EAST_ELEVATIONS_and_PERSPECTIVE.pdf

A-5_R12_2013-08-27_NORTH_and_WEST_ELEVATIONS_and_PERSPECTIVE.pdf

COVER_2013-08-27.pdf

 Site Plans

CSP-01_R20_2013-08-23_SITE_LAYOUT_PLAN.PDF

CSP-01AE_R04_2013-08-23_TRUCK_TURNING_EXHIBIT.PDF

CSP-01FS_R01_2013-08-23_FIRE_AND_SAFETY_PLAN.PDF

CSP-02_R17_2013-08-23_SITE_GRADING_PLAN.PDF

CSP-03_R19_2013-08-23_SITE_UTILITIES_PLAN.PDF

CSP-04_R05_2013-08-23_SITE_EandS_CONTROL_PLAN.PDF

CSP-05_R03_2013-08-23_SITE_LANDSCAPING_PLAN.PDF

CSP-06_R03_2013-08-23_SITE_LIGHTING_PLAN.PDF

CSP-07_R02_2013-08-23_STORM_PROFILES.PDF

CSP-08_R01_2013-08-23_DETAILS.PDF

CSP-09_R01_2013-08-23_DETAILS.PDF

CSP-10_R02_2013-08-23_DETAILS.PDF

CSP-11_R01_2013-08-23_DETAILS.PDF

CSP-12_R04_2013-08-23_DETAILS.PDF

CSP-12A_R01_2013-08-23_DETAILS.PDF

CSP-13_R00_2013-08-23_PROPOSED_ROUTE_120_FENCE_PLAN.PDF

CSP-14_R00_2013-08-23_PROPOSED_ROUTE_120_FENCE_PLAN.PDF

CSP-15_R00_2013-08-23_TRAFFIC_CONTROL_PLAN.PDF

CSP-16_R00_2013-08-23_TRAFFIC_CONTROL_PLAN.PDF

EX-1_R07_2013-08-23_EXISTING_CONDITIONS_PLAN.PDF

Stormwater Management

STORMWATER_MANAGEMENT_REPORT_2012-10-17.pdf

Traffic Study

TRAFFIC_STUDY_2012-10-04.pdf

 

JULY 2013

20130628_Architectural_Submission_Set.pdf

10145-CSP-01-LAYOUT-R19.PDF 

10145-CSP-02-GRADING-R16.PDF

10145-CSP-03-UTILITIES-R18.PDF

10145-CSP-04-EandS-R4.PDF

10145-CSP-05-LAND-R2.PDF

10145-CSP-06-LIGHTING-R2.PDF

10145-CSP-07-PROFILES-R1.PDF

10145-CSP-08-dets.PDF

10145-CSP-09-dets.PDF

10145-CSP-10-dets.PDF

10145-CSP-11-dets.PDF

10145-CSP-12-dets.PDF

10145-CSP-1AE-AUTOTURN-R3.PDF

10145-CSP-1FS-FIRETRUCK.PDF

10145-EX-1-EXCOND-R6.PDF

 

 

May 2013

Architecturals

CoverC.pdf

A-1C.pdf

A-2.pdf

A-3.pdf

A-4C.pdf

A-5C.pdf

Drawings

10145-EX-01-EXCOND.PDF

10145-CSP-01-alt-LAYOUT.PDF

10145-CSP-01AE-alt-AUTOTURN.PDF

10145-CSP-02-alt-GRADING.PDF

10145-CSP-03-alt-UTILITIES.PDF

10145-CSP-04-alt-EandS.PDF

10145-CSP-05-alt-LAND.PDF

10145-CSP-06-alt-LIGHTING.PDF

10145-CSP-07-alt-PROFILES.PDF

10145-CSP-08-DET.PDF

10145-CSP-09-DET.PDF

10145-CSP-10-DET.PDF

10145-CSP-11-DET.PDF

10145-CSP-12-DET.PDF

February 2013

DDW Letter
Comment_ltr_-_Chappaqua.pdf

JMC Drawings

10145-CSP-01.PDF

10145-CSP-02.PDF

JMC Figures

10145-AERIAL-PR-1_02-01-2013.pdf

WMW Visual Analysis

20130130_Visual_Analysis_Report_Chappaqua_Station_WMW.pdf

December 2012

Chappaqua Station 12/21/12 Revised Submission

CONIFER-PROPOSAL.pdf

SANIPRO-LETTER.pdf

Response_Letter.pdf

ULI-TABLE-1.pdf

ULI-TABLES-2and3.pdf

10145-CSP-01.PDF

10145-CSP-02.PDF

10145-CSP-03.PDF

10145-EX-1.PDF

10145-PARKING-GRAPHS.pdf

10145-PARKING-OVERFLOW_AREA.pdf

10145-PARKING-SURVEY_AREA.pdf

10145-PARKING-TABLES.pdf

10145-SIDEWALK-FIGURE-SW-1.pdf

10145-SU-30-TRUCK-TURNING.pdf

20121214_Environmental_Noise-Facade_Study_AC_TEK_001_rev1.pdf

Propsed Easements in the Town of New Castle (letter)

 

October 2012

Chappaqua Station Full Sub. 10/17/2012 - (please note some of these files are very large in size)

Submission_Letter_10-18-2012.pdf

Architecturals

Architect-Full-Set.pdf

Chappaqua Fire Dept

20120321_Chappaqua FireDept_letter-3-9-12meeting_comments.pdf

Eviron. Noise-Facade Study

20120307_Environmental_Noise-Facade_Study_AC_TEK_001.pdf

JMC Site Plans

10145-SITE-PLANS-FULL-SET.pdf

LEED

20121016_CS_LEED_2009_NC_Docs5719.pdf

Stormwater Management Report

FULL-SWMR_10-17-2012.pdf

Structural Drawings

S-1.pdf

S-2.pdf

Traffic Study

10145-TIS_10-04-2012-R1.pdf

Visual Analysis

20121016_Visual_Analysis_Report_Chappaqua_Station_WMW.pdf

Other Files

10145-ALP-01.PDF

10145-E-AERIAL-WDP-09-19-2012.pdf

 

September 2012

Monitor's Letter • September 7, 2012

 

July 2012

Monitor’s letter dated July 12, 2012


June 2012

Chappaqua Station Approval Submission 6/15/12 

The following links are to PDFs of the submitted files for the Special Permit Approval Submission for Chappaqua Station. 

2.3 Management

2.3 Resume and Bios

3.1 Phase I Updated 2011-10-24

3.1 Phase II Groundwater Report

3.1 PS&S Letter - Town of New Castle

3.1 Remedial Investigation Work Plan

7.1 Letters of Support

7.4 Demographic

10145  Civil Plans

A01

A02

A03

A04

A05

Coversheet

Full SWMR 05-31-2012

MX4101N - Transmittal Letter - June 5, 2012

MX4101N - Application Form

TIS - Traffic and Parking Study

Chappaqua Station Application June 5, 2012

Application 6/5/12 -0145-CSP-1.PDF

Application 6/5/12 -10145-CSP-2.PDF

Application 6/5/12 -10145-CSP-3.PDF

Application 6/5/12 -10145-ESP-1.pdf

Application 6/5/12 -10145-EX-1.PDF

Application 6/5/12 -20120501_A01.pdf

Application 6/5/12 -20120502_A02.pdf

Application 6/5/12 -20120501_A03.pdf

Application 6/5/12 -20120502_A04.pdf

Application 6/5/12 -20120501_A05.pdf

Application 6/5/12 -20120502_Coversheet.pdf

Application 6/5/12 -adminddwt.com_20120503_023831.pdf

MAY 2012

Monitors letter to Conifer 4/12/12 

Applicant Report on Meeting with Fire Department  3/15/12.pdf

Westchester County Planning Board Refferal Review.pdf

 

Letter from Conifer to James E Johnson. May 2012.pdf

Letter from Town to James E Johnson. May 2012.pdf